Product details
Essential details
MOQ:1
Product Introduction


Detailed Description

I. Control Principle & Structural Features

The equipment mainly consists of an electric lifting platform, an electric traversing carriage and a transition bridge. It is fixedly installed under the trench track, used for removing and installing wheelsets from/into locomotives, as well as hoisting wheelsets in and out.
The electric traversing carriage carries the wheelsets and transports them within the foundation pit.
When the equipment is not in operation, the transition bridge is positioned by a pin-through mechanism to maintain a smooth and continuous surface with sufficient load-bearing capacity, allowing locomotives to pass safely.
Both the platform lifting and the traversing carriage movement are equipped with safety devices to ensure safe and reliable operation.
A mechanical locking device is provided to guarantee the safety of operators.


II. Main Technical Parameters

  1. Power supply: Three-phase AC 380V±10%, 50Hz, 10kVA
  2. Lifting capacity of platform: 40 t
  3. Lifting stroke of platform: 1400 mm
  4. Traversing stroke of platform: 3000 mm
  5. Lifting speed of platform: 0.21 m/min
  6. Load capacity of electric traversing carriage: 25 t
  7. Travel speed of electric traversing carriage: 11.3 m/min
  8. Motor power of electric traversing carriage: 2.2 kW
  9. Static load capacity of transition bridge: 50 t, allowing stable passage of 140 t locomotives
  10. Length of transition bridge: 2170 mm; Rail specification: 50 kg/m
  11. Gauge of transition bridge: 1435 mm
  12. Control mode: Fixed-position, centralized push-button inching & automatic control
  13. Electrical protection grade of motors: IP44 or higher
  14. Overall dimensions: 3300 × 1700 × 2600 mm
  15. Total weight: 4 tons

III. Installation Requirements

  1. Wheel drop pit dimensions: Length 6.4 m, Width 2.37 m, Depth 3 m
  2. Power supply: Three-phase AC 380V, 50Hz, 3N, 6kVA
  3. The equipment shall be installed in a special indoor pit.
    Operating ambient temperature: -10℃ to 50℃; relative humidity: < 90%
  4. The distance between the lifting platform and the wall at the workpiece removal end and the side walls shall be no less than 15 mm.
    The top surface of the platform shall be horizontal, and the 15 mm clearance shall remain unchanged after lifting.

Leave your information and
we will contact you.
Lisa
Lisa
Jenny
Jenny
WhatsApp
WhatsApp